
BJD to organise farmers rally in Odisha's Bargarh
Addressing a press conference here, BJD farmers' cell convenor Prasanna Acharya said the BJP governments both at the Centre and the state are working against the interest of farmers.
Bhubaneswar, Aug 8 (PTI) Dubbing the ruling BJP as 'anti-farmer', opposition BJD on Friday announced to hold a massive farmers' rally in Odisha's Bargarh on August 18 to make them aware how the saffron party has been exploiting them.
Allocation to Odisha for the agriculture sector has been slashed from Rs 21,011 crore in 2023-24 to Rs 17,089 crore in 2024-25. While the state received Rs 146 crore under Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) in 2023-24, it has come down to only Rs 32 crore in in 2024-25, he claimed.
Acharya also said the farmers in the state are annoyed over issues related to paddy procurement.
BJD vice-president Sanjay Das Burma alleged that the new paddy procurement registration rules — requiring legal heir certificates — are deterring farmers and being used as a tactic to avoid paying the promised Rs 800 per quintal input subsidy.
This apart, the party alleged that farmers are being forced into distress sale as the Food Corporation of India (FCI) is not lifting the paddy on time.
Acharya said BJD's 'Krushak Samabesh' (farmers' conventions) will be held across the state, with the first such protest will be held in Bargarh on August 18. PTI AAM AAM MNB
This report is auto-generated from PTI news service. ThePrint holds no responsibility for its content.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Indian Express
14 minutes ago
- New Indian Express
Teynampet-Saidapet flyover is TN's costliest at Rs 195 crore per km
Soil stabilisation, utility relocation jacked up cost Following the awarding of contract in November-December 2023, civil works of the project, executed by J Kumar Infraprojects, began in January 2024. The new four-lane elevated corridor aims to reduce the travel time between Teynampet and Saidapet on Anna Salai from 40 minutes to just 10 minutes, while easing congestion at seven key intersections — Eldams Road, SIET College Road, Cenotaph Road, Nandanam, CIT Nagar, CIT Nagar 1st Main Road (towards T Nagar), and Jones Road. This section of the arterial Anna Salai handles 2.45 lakh passenger car units per day. A senior highways official attributed the high cost of the Teynampet-Saidapet project to several critical factors such as soil stabilisation challenges requiring micro-piling (since shallow foundations prevented conventional piling), extensive utility relocations in a densely-congested area, and advanced construction techniques to minimise pillar loads and safeguard the underground metro tunnel. 'Soil stabilisation was achieved using geosynthetic materials like geogrids and geocells, among other solutions,' stated an official document released by the state highways department. The Teynampet-Saidapet metro line runs 17-18 metres beneath Anna Salai. The highways have drilled up to 7 metres from the road surface to lay the flyover's foundation. The elevated road spans 2.4 km directly above the metro line, including 460 metres over the Nandanam and Teynampet stations, and 655 metres along the non-metro stretch (excluding entry and exit ramps). In total, 69 pillars are being erected above the metro line, 22 on the non-metro stretch, and 41 portal frames covering the 460 metres over the two stations. As of July, about 30% of the work has been completed, according to official documents. Industry sources said NHAI projects, typically executed under Public-Private Partnership (PPP) mode, are usually more expensive than state highways projects, which are entirely government-funded. 'The estimation of state highways and NHAI projects are arrived at with an anticipation that materials, labour and other expenses will go up by 5% to 7% every year. By all measures, the cost of the state highways project ought to be lower than that of the NHAI unless it's being executed under exceptional conditions,' sources added. Even after accounting for inflation and price escalation, the proposed 18.5 km six-lane elevated corridor between Kilambakkam and Maraimalainagar, with entry and exit ramps at three locations, is estimated to cost Rs 3,450 crore, averaging Rs 188 crore per km. Likewise, two upcoming six-lane elevated corridor projects of NHAI – from Maduravoyal to Outer Ring Road and from ORR to Sriperumbudur, scheduled for award in 2025-26 – are projected to have an average cost of Rs 160 cr/km.


Hans India
14 minutes ago
- Hans India
Radhakrishnan named NDA's V-P candidate
New Delhi: Maharashtra Governor Chandrapuram Ponnusamy Radhakrishnan, a seasoned BJP leader from Tamil Nadu with an RSS background, was on Sunday named the vice-presidential candidate of the ruling National Democratic Alliance. BJP president J P Nadda made the announcement following a meeting of the party's parliamentary board, which included Prime Minister Narendra Modi, and consulting the party's allies. Nadda appealed for unanimous election of Radhakrishnan (67), an OBC leader and two-time former member of Lok Sabha, to the constitutional position, saying the BJP leaders had spoken to the Opposition parties last week and will continue to do so. The Opposition leaders had told the BJP interlocutors that they can make up their mind only after being told of the ruling alliance's nominee, Nadda said, adding that his party will reach out to them again. Due to the comfortable majority of the BJP and its allies in the electoral college, comprising Lok Sabha and Rajya Sabha members, Radhakrishnan's election is all but certain, and the party hopes that his elevation will help it make fresh inroads in Tamil Nadu, where elections are due next year. Radhakrishnan belongs to the influential Gounder caste, an OBC community, in Tamil Nadu. Nadda emphasised on his nearly 40 years in public life, noting that he is well regarded in different parties and commands respect among various sections of society. "He is considered a statesman," Nadda said of the former Coimbatore MP who was made the Jharkhand governor in 2023 and then shifted to Maharashtra in July 2024. Unlike his predecessor Jagdeep Dhankhar, who was also a governor like him before being named as the NDA's vice-presidential nominee in 2022, Radhakrishnan has refrained from cultivating a public profile on political issues and skirted any controversy. Defence Minister Rajnath Singh, sources said, will oversee the vice-presidential election, while Parliamentary Affairs Minister Kiren Rijiju will be the polling agent. The last date for filing nomination is August 21. Chief ministers and deputy chief ministers of the BJP-led alliance will to be part of Radhakrishnan's nomination-filing exercise, besides the prime minister and Union ministers. If the Opposition alsonames its candidate, the election will be held on September 9.


Hans India
14 minutes ago
- Hans India
Farmers left high & dry amid acute urea shortage in Bhadradri
Kothagudem: Althoughthe state government had flagged the sharp shortfall in urea supply to the state and the Centre has since claimed that 'adequate' urea is being supplied to Telangana, the ground reality is pathetic in Bhadradi, where farmers a facing a double whammy. The monsoon has played truant in Bhadradri Kothagudem, where rainfall in June stood at 134.4 mm, against the expected 169.1 mm — a 20% shortfall. Although July saw surplus rainfall, it was unevenly spread and provided little relief to most farmers. That apart, right in the district's heartland and elsewhere an acute shortage of urea is pushing farmers to the brink. The district has over 2.08 lakh acres under cotton cultivation and more than 12,000 acres under paddy. With the Kharif season in full swing, farmers were expecting timely rainfall and adequate fertiliser supplies. However, both have fallen short of the requirement. The district requires 30,277 metric tonnes (MT) of urea by August, but only 19,202 MT have been supplied so far. Of this, 16,786 MT have been distributed, while 3,166 MT remain locked away with private dealers selling them at a premium— raising serious questions over supply chain transparency and accountability. Scenes of desperation are playing out daily at primary agricultural society godowns and dealers' shops. Farmers are queuing up before dawn, hoping to get their hands on just a couple of urea bags. In many mandals, godowns are located miles away, forcing small and marginal farmers to spend avoidable extra on transport — often Rs. 50 per bag just, apart from auto fares. The other option is worse: 'We can't afford to wait in line for hours, only to be told 'stock is over'. If we go to private dealers, they charge Rs. 350 or more per bag,' laments Satish, a farmer from Rampuram. 'Cultivating cotton without urea at this stage is unthinkable.' Amid spotty monsoon rains, nutrient support becomes even more vital. Although the Agriculture Department claims 'there is no shortage', officials quietly admit in confidence that 'at least 10,000 MT more urea is needed immediately'. What is galling is that, some large farmers are allegedly hoarding stock by leveraging their influence at cooperative societies. This way, small farmers are being elbowed out by biometric systems and unwarranted delays in distribution. When contacted, District Agriculture Officer V. Baburao said, 'We are conducting inspections and have warned dealers against overpricing. Nano urea is also being promoted as an alternative, though farmers remain hesitant. Another 10,000 MT of urea is expected soon.' All told, hope is wearing thin for most farmers. Paddy fields are drying up, and cotton crops are showing stunted growth. As the Kharif season enters a critical phase, farmers are demanding immediate government intervention, transparent distribution of fertilisers, and strict action against black marketing. As of now, the fields of Bhadradri are parched, abandoned by the very systems that are meant to sustain them.