logo
Johor rolls out new housing plan for low income group outside eKasih system

Johor rolls out new housing plan for low income group outside eKasih system

The Sun2 days ago

ISKANDAR PUTERI: The newly introduced Rumah Prihatin Johor (RPJ) housing initiative to help low-income individuals in rural areas own homes, is expected to begin construction in August.
State Housing and Local Government Committee chairman Datuk Mohd Jafni Md Shukor said RPJ is a state government initiative to fill the gap in housing aid for those who are excluded or not listed under the e-Kasih database, but still fall under the low-income category.
He said applications are now open for 500 units to be developed with an allocation of RM15 million, offering two categories of homes priced at RM86,000 for three-bedroom units and RM66,000 for two-bedroom units.
'These houses will be built on privately owned land and are expected to be completed within seven months.
'This is one of the fastest and most effective housing programmes ever implemented in Johor, with direct impact on the people,' he told a press conference here today.
Mohd Jafni said the state government is also providing a subsidy of RM30,000 and successful applicants are only required to pay RM36,000 or RM56,000, depending on the type of home.
He said the RPJ eligibility conditions have also been improved, including considering applicants who share land with family and have not received any form of housing assistance from any agency.
Meanwhile, under the Rumah Kasih Johor (RKJ) initiative, construction of 500 housing units has been ongoing since 2023 and will continue until 2026 across all 56 state constituencies, with an allocation of over RM67.5 million.
So far, 50 units have been completed and handed over to recipients, while 120 units are under construction and 165 units are in the implementation stage, he said.
Mohd Jafni said the RPJ and RKJ initiatives were implemented with strong cooperation from the Johor Housing Development Corporation (PKPJ), local authorities, district offices and elected representatives.
He also reminded the public that the state government has not appointed any agents or middlemen for applications involving the Johor Affordable Housing (RMMJ) scheme, and all applications must be made through the 'erumah' portal.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

RM250,000 concrete drain completed at Lrg Semaba 7 to tackle flooding issues
RM250,000 concrete drain completed at Lrg Semaba 7 to tackle flooding issues

Borneo Post

time2 hours ago

  • Borneo Post

RM250,000 concrete drain completed at Lrg Semaba 7 to tackle flooding issues

Yap (second left) and others seen at the site of the completed concrete drain at the T-junction of Lorong Semaba 7. KUCHING (June 7): The construction of a concrete drain at the T-junction of Lorong Semaba 7 has been completed at the cost of RM250,000, said Kota Sentosa assemblyman Wilfred Yap. He said the rural transformation programme (RTP) project had resolved long-standing drainage and flooding issues in the area. 'With the completion of this phase, residents in the neighbourhood can now look forward to improved water flow, reduced flood risk and better overall living conditions,' he said in a statement. He emphasised that the initiative is more than just a basic infrastructure upgrade. 'It is a commitment to ensure that every part of Kota Sentosa is not left behind in terms of infrastructure. Too many of our older residential areas still suffer from outdated or insufficient basic amenities. 'I am working tirelessly to correct that,' he added. Yap also revealed that the Padawan Municipal Council (MPP) has conducted survey and assessment works on the opposite side of the same T-junction, as well as another stretch of earth drains along Lorong Semaba 11. The proposed next phase will involve the construction of additional concrete drains, with a combined estimated cost of RM400,000, and MPP engineers are currently preparing the Bill of Quantities to move the project forward. Reaffirming his commitment to infrastructure development, Yap said he will continue to advocate for improvements under the RTP and other government allocations. 'Development cannot be concentrated in one area. As your elected representative, I will continue to press for improvements – street by street, lorong (lane) by lorong – so that all residents of Kota Sentosa enjoy the benefits of proper, modern infrastructure.' Yap also highlighted that his efforts are aligned with the Gabungan Parti Sarawak (GPS) government's focus on inclusive development and narrowing the infrastructure gap, particularly in semi-urban and suburban communities. He emphasised that infrastructure is not just about roads and drains. 'It's about dignity, safety and improving the quality of life for the people I serve. I will not rest until every kampung, taman and lorong in Kota Sentosa sees tangible progress,' he pledged. concrete drain flooding jalan semaba lead Wilfred Yap

Rep distributes RM147,000 in MRP grants to Bawang Assan NGOs
Rep distributes RM147,000 in MRP grants to Bawang Assan NGOs

Borneo Post

time2 hours ago

  • Borneo Post

Rep distributes RM147,000 in MRP grants to Bawang Assan NGOs

Wong (seated front, centre) poses with the guests and the MRP grant recipients. SIBU (June 7): Bawang Assan assemblyman Dato Sri Wong Soon Koh has distributed RM147,000 in Minor Rural Project (MRP) grants to 14 recipients, comprising non-governmental organisations (NGOs) and associations within the Bawang Assan state constituency. This marks the first group of recipients to receive allocations for the year through the Bawang Assan Progressive Democratic Party (PDP) Service Centre. 'We have over 100 recipients in total, with an overall allocation of RM2 million. The remaining grants will be distributed next week,' said Wong. He noted that the allocation is part of his ongoing effort to support community-based initiatives and welfare programmes, and that recipients who did not receive funds in this round may reapply in subsequent phases. Wong, who also serves as PDP senior vice president, stated that he receives an annual allocation of RM8 million from the Sarawak government for development and welfare initiatives in his constituency. This includes RM2 million under the Minor Rural Project (MRP), RM5 million for the Rural Transformation Programme (RTP), and RM1 million for the Sarawak Poor Housing Improvement Programme (PPRMS). He added that Bawang Assan is home to approximately 30,000 voters, with a demographic breakdown of 54 per cent Chinese and 46 per cent Bumiputera, of which around 45 per cent are Iban. 'We will do our best to be fair. Every year, we ensure these allocations reach those in need,' he emphasised. Also present at the presentation ceremony were Joshua Ting, a political secretary to the Sarawak Premier, and Councillor Wong Hua, chairman of Bawang Assan PDP. bawang assan MRP grants ngos wong soon koh

‘Flood prevention rules to be updated'
‘Flood prevention rules to be updated'

The Star

time2 hours ago

  • The Star

‘Flood prevention rules to be updated'

Continuous rainfall from March 19 to 20 this year caused floods in parts of Taman Tampoi Indah 2, Johor Baru. — Filepic Johor government will hold workshops to enable all 16 local authorities to better tackle floods, said state executive councillor Datuk Mohd Jafni Md Shukor. The housing and local gov­ern­ment committee chairman said they would start with local councils in the Johor-Singapore Special Economic Zone as these faced the most flood-related issues. 'Our workshops since 2023 focused on getting higher allocations for flood mitigation efforts, and improving enforcement. 'This year, we will focus on improving regulations, especially for retention ponds, irrigation and drainage systems. 'This also includes standard operating procedures (SOP) that developers must follow before starting work on a site,' he said in an interview. He added that the workshops would begin in the third quarter of this year. Under the SOP, developers must build retention ponds before starting a project. Mohd Jafni also said outdated regulations must be reviewed. 'The regulations had been in use for more than 10 years and can no longer cope with the current volume of rainfall which is four to six times more than before,' he said. Mohd Jafni said earlier workshops had yielded some results. 'Just this year we received more than RM100mil, which is likely one of the highest allocation amounts from the Housing and Local Government Ministry for flood-related issues,' he disclosed. He said that some RM213mil had been allocated to carry out over 350 flood-related projects since 2023. This includes RM106mil for flood mitigation efforts involving all local authorities this year. 'Of the 123 projects for this year, 16 are under Johor Baru City Council, which has been allocated about RM42mil. 'Another 16 are under Pasir Gudang City Council with RM9.1mil, while 13 are under Iskandar Puteri City Council with some RM36mil' said Mohd Jafni. 'Through the projects, we hope to resolve at least half of the flood issues,' he added.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store