
MHADA invites tenders for cluster redevelopment of Kamathipura
The Maharashtra Housing and Area Development Authority (MHADA) has invited tenders to appoint a Construction and Development Agency for the cluster redevelopment of Kamathipura, which will be implemented by the Mumbai Building Repairs and Reconstruction Board (MBRRB), a unit of MHADA.
Kamathipura is one of South Mumbai's oldest and most historically significant neighbourhoods. The MBRRB aims to provide permanent, safe and upgraded homes to 8,001 residents and compensate 800 landowners.
The locality spans across 34 acres and consists of a narrow and aging colony which accommodates approximately 943 cessed buildings in 15 lanes. Most of these buildings are almost a century old. The scheme now represents a deviation from redevelopment of individual buildings to cluster renewal, as per Regulation 33(9) of the Development Control and Promotion Regulations (DCPR) 2034.
The redevelopment project of this cluster, supported by the Government of Maharashtra, will be conducted under the leadership of Chief Minister Devendra Fadnavis and Deputy Chief Minister and Housing Minister Eknath Shinde. It is also being actively supported by Assembly Speaker Rahul Narwekar, MP Arvind Sawant, MLA Amin Patel, as well as local residents.
An official from MBRRB said, 'Upon completion, the project will reshape Kamathipura into a contemporary urban village. There will be not only residential apartments but commercial areas, recreational grounds and better infrastructure too.'
As per the official, 44,000 square metres of land will be transferred to MHADA by the chosen developer. Approximately 4,500 new homes will be introduced into the city's housing stock through the redevelopment.
The government approved the cluster redevelopment project through a resolution dated January 12, 2023, after which Mahimtura Consultants were engaged to prepare the blueprint. The project has been given the title 'Kamathipura Cluster Redevelopment – Urban Village.'
The compensation for landowners has also been outlined by MHADA. According to a July 2024 government resolution, the landowners will be given dwelling units as per the landholding size, from a single 500 square feet unit for plots up to 50 square metres, to extra units for larger plots.
'The process of tendering is the first big step towards reviving Kamathipura and enhancing the lives of its inhabitants. MHADA wishes this project to act as a model for urban regeneration in heritage neighborhoods throughout Mumbai,' said the official.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
2 hours ago
- Indian Express
CM calls for swift execution of infra, green energy projects
Chief Minister Devendra Fadnavis on Friday directed the state's energy department to adopt time-bound planning for the swift execution of infrastructure and green energy projects, stating that strengthening the power sector is a key to ensure affordable and reliable electricity for citizens. Fadnavis chaired a review meeting of the energy department at the Sahyadri Guest House in Mumbai. The meeting was attended by senior officials, including Additional Chief Secretary (Energy) Abha Shukla, Additional Chief Secretary (Finance) O P Gupta, and heads of key power utilities such as MSEDCL, MahaTransco, and MahaGenco. Highlighting the importance of flagship schemes, the Chief Minister urged the completion of the Chief Minister's Solar Agricultural Feeder Scheme 2.0 by December 2025. He further directed Maharashtra Energy Development Agency (MahaUrja) to expedite surveys under the PM Suryaghar Muft Bijli Yojana, particularly for electrifying all government buildings through solar energy. Fadnavis also called for a joint initiative by MahaUrja and MSEDCL to develop model solar villages. He asked for the adoption of Gati Shakti-like coordination mechanisms to fast-track energy projects, including generation, transmission, and distribution.


Indian Express
2 hours ago
- Indian Express
State, Mumbai-based firm sign MoU to set up helicopter manufacturing facility in Nagpur
Mumbai-based Max Aerospace and Aviation Pvt Ltd on Friday signed a Memorandum of Understanding (MoU) with the state government to set up a helicopter manufacturing facility in Nagpur with an investment of Rs 8,000 crore over the next eight years. The MoU was signed in the presence of Chief Minister Devendra Fadnavis at the Sahyadri Guest House in Mumbai. The plant is expected to generate approximately 2,000 direct and indirect employment opportunities and is set to begin operations by 2026. Speaking at the event, Fadnavis said the project aligns with the Centre's 'Make in India' and 'Atmanirbhar Bharat' initiatives and will position Nagpur as a key hub for aerospace manufacturing in the country. 'Max Aerospace choosing Nagpur for this project is a significant step. The state government is committed to providing all necessary support to ensure timely execution of the project,' he said. According to officials, the upcoming facility will focus on the customisation, integration, and flight testing of rotary-wing platforms. Fadnavis emphasised that the state has created favourable conditions for defence manufacturing in Nagpur and assured that all necessary cooperation will be provided to Max Aerospace. The MoU was signed between P. Anbalagan, Principal Secretary of the Department of Industries, and Bharat Malkani, chairperson of Max Aerospace. CEO of Maharashtra Industrial Development Corporation (MIDC) P Velarasu and other senior state officials were also present. 'This is Maharashtra's first dedicated facility for full-scale helicopter production. It will not only support India's defence manufacturing goals but also enhance the aerospace supply chain capabilities in the region,' said Malkani.


Time of India
3 hours ago
- Time of India
Fadnavis pitches for fast-tracking of green energy projects, calls for time-bound execution
Mumbai: Maharashtra Chief Minister Devendra Fadnavis on Thursday directed the state energy department to expedite the completion of green energy development projects and strengthen the power distribution infrastructure through time-bound planning. Presiding over a review meeting of the energy department, he said ensuring affordable and uninterrupted electricity supply to citizens was the state government's priority. "There is a need to focus on green energy development in the coming years, and projects must be completed on schedule," he said. Fadnavis said the 'Mukhyamantri Saur Krushi Vahini Yojana 2.0', a flagship scheme to supply solar energy to agriculture feeders, should be completed by December 2025. He also directed the Maharashtra Energy Development Agency (MEDA) to complete the survey for solarisation of all government buildings under the 'PM Surya Ghar: Muft Bijli Yojana' and accelerate implementation. He called for joint efforts by MEDA and the state power distribution company Mahavitaran to develop model solar villages, and said all projects in the power generation, transmission and distribution sectors must adhere to strict deadlines, following the principles of the Gati Shakti mission. Fadnavis also stressed the need to reduce transmission losses and implement central schemes effectively, while launching awareness campaigns for efficient energy use. He further directed officials to recover pending dues from local self-government bodies and enhance capacity to meet growing future demand. Emphasising the importance of emerging technologies, the chief minister said policy-driven research, development and skill-building initiatives should be undertaken to develop the hydrogen energy ecosystem in the state.