Gadkari pushes for energy independence with hydrogen, ethanol and biogas plans
For Union Minister Nitin Gadkari, it is not just an energy issue—it's an economic, strategic, and environmental imperative (Mohd Nasir for HT Auto) Check Offers
At the heart of India's transport revolution lies a sharp, unavoidable truth: 87 per cent of the nation's crude oil is imported, draining nearly ₹ 22 lakh crore annually from the exchequer. For Union Minister Nitin Gadkari, this is not just an energy issue—it's an economic, strategic, and environmental imperative.
And it's why the government is doubling down on alternate fuels as the centrepiece of India's mobility roadmap. 'Our policy is simple—import substitute, cost-effective, pollution-free, and indigenous," Gadkari stated during the MoU exchange ceremony between Toyota Kirloskar Motor and Ohmium International. 'The aim is not just to reduce emissions, but to make India an energy exporter instead of an importer."
From ethanol-blended fuels and biodiesel to compressed biogas and green hydrogen, India's approach is deliberately multi-pronged—prioritising scalability, local availability, and economic viability. This strategic diversity isn't a fallback—it's a forward leap. The hydrogen truck trials
Nowhere is this vision more visible than on India's highways. The government has already flagged off large-scale hydrogen truck trials across critical freight corridors. Funded with ₹ 500 crore under National Green Hydrogen Mission, the project covers 27 vehicles, 10 routes, and five prime consortiums such as Tata Motors, Ashok Leyland, Volvo, NTPC, BPCL, and Reliance.
Also Read : Bioenergy can cover 50% of India's fossil fuel consumption in 5 years: Nitin Gadkari
Hydrogen trucks, both H2-ICE (Hydrogen Internal Combustion Engine) and fuel cell types, are already in service on many of India's prime logistics routes. These are freight lanes like Greater Noida–Delhi–Agra, Mumbai–Pune, Jamnagar–Vadodara, Bhubaneswar–Konark–Puri, and Visakhapatnam–Vijayawada.
These routes have been chosen strategically to validate the performance, reliability, and scalability of hydrogen-fueled heavy-duty trucks under actual commercial operations.
These aren't ceremonial pilot paths. Each vehicle is logging 300–500 km per run, supported by a growing network of nine hydrogen refuelling stations. The data collected over the next 24 months will shape not only technical decisions, but policy, incentives, and infrastructure rollout plans. 'Hydrogen is the fuel of the future," Gadkari said, adding that the trials would 'unlock India's leadership in clean freight mobility." Green hydrogen
Gadkari made it clear that green hydrogen—produced using renewable energy—is the long-term goal. But the economics must work.
He urged scientists, startups, and OEMs to explore unconventional hydrogen production routes—municipal solid waste, organic matter, and even bamboo plantations. 'We need to bring the cost down. That's where the battle will be won," he said.
Interestingly, companies like NTPC and private players are already experimenting with hydrogen sourced from waste-to-gas plants and biomass digesters, offering a potential pathway to low-cost, decentralised hydrogen production. Ethanol, flex-fuels & isobutanol: India's broader fuel strategy
While hydrogen keeps hogging the spotlight, India's alternative fuel strategy is much larger. Union Minister Nitin Gadkari reaffirmed that his ministry is going full steam with a wide range of clean fuel technologies. That includes rolling out 20 per cent ethanol fuel blending in petrol all over the country as part of efforts to cut crude oil dependence.
Also Read : Fall in lithium battery prices will boost EV sector, says Nitin Gadkari
The government is also promoting flex-fuel hybrid cars, like the BS6 Stage II prototype on the Toyota Innova Hycross, which combines ethanol compatibility with hybrid electric efficiency. Besides, isobutanol-diesel blends are being tested to evaluate their commercial suitability.
Concurrently, growth of compressed biogas (CBG) networks in rural areas is being pushed, offering farmers fresh energy-connected income sources while enabling decentralized, low-emission energy production. Gadkari revealed that his ministry has already cleared 100 per cent ethanol use in flex-fuel vehicles and is working to enable IC engine retrofits that can run on hydrogen or advanced biofuels. India's auto sector: From global challenger to clean tech leader?
Beyond fuel, Gadkari sees this as a moment of transformation for India's auto industry. Valued at ₹ 22 lakh crore, the sector is now the third-largest in the world. But his ambitions stretch further. 'With our innovation ecosystem and domestic capacity, I believe we can become the number one automobile market globally in five years," the Minister expressed
This confidence rests on more than just optimism. India's OEMs are already investing in hydrogen, electric, ethanol and hybrid platforms. And with policies now aligned toward cleaner, localised solutions, the industry is being nudged—not gently—into a leadership role in sustainable mobility.
India's transition to alternate fuels is no longer theoretical. Whether hydrogen trucks are carrying cargo along industrial arteries, ethanol hybrids reducing the need for petrol, or biogas factories converting garbage into energy—the change is already happening.
And sure, problems persist—most notably on cost and infrastructure—but the momentum is genuine. As Gadkari summed it up, 'This is not just about transport. It's about future-proofing our economy, cleaning our air, and putting India on the map as a leader in clean energy."
Get insights into Upcoming Cars In India, Electric Vehicles, Upcoming Bikes in India and cutting-edge technology transforming the automotive landscape.
First Published Date: 26 Jun 2025, 10:36 AM IST
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
3 hours ago
- Time of India
NTPC's 3,300-MW power plant in Bihar to go fully operational from July 1
New Delhi: State-run power major NTPC on Thursday announced that its 3,300 MW Barh Super Thermal Power Project in Bihar will become fully commercially operational from July 1. This development comes as the last remaining unit under Stage I, Unit 3 of 660 MW, is set to begin commercial power supply. "In terms of Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, we would like to inform you that Unit 3 (660 MW) of Barh Super Thermal Power Project, Stage-I (3x660 MW) is declared on commercial operation w.e.f 00:00 Hrs of 01.07.2025," the company said in its stock exchange filing. "With this, the total installed and commercial capacity of NTPC on a standalone and group basis will become 60,978 MW & 82,080 MW, respectively," it added in the filing. The Barh project consists of five units of 660 MW each, divided into two stages. Stage I includes three units, while Stage II has two. With Unit 3 now ready for commercial operation, all five units of the project will be fully functional. The earlier four units of the plant have already been commissioned over the years. Units 1 and 2, both of 660 MW under Stage I, were commissioned in November 2021 and July 2023, respectively. Under Stage II, Unit 4 and Unit 5 were commissioned earlier in November 2014 and February 2016. According to NTPC's regulatory filing, Unit 3 (660 MW) of the Barh Super Thermal Power Project, Stage I, will officially begin commercial operations from July 1. With this, the entire 3,300 MW capacity of the Barh project will be contributing to India's power grid. Following this addition, NTPC's total installed and commercial capacity will rise to 60,978 MW on a standalone basis and 82,080 MW on a group basis. The Barh Super Thermal Power Project is one of NTPC's key ventures in Bihar and has been developed in phases to ensure a steady boost in power generation capacity in the region. --IANS pk/vd


Time of India
4 hours ago
- Time of India
Soon FASTag may be used to buy insurance, pay challans
You may soon be able to use your vehicle's FASTag to pay traffic challans , parking fee, insurance premium and for EV charging , in addition to highway tolls . With nearly 11 crore FASTags issued by banks, the govt is exploring ways to expand its use as a flexible payment tool. To take this forward and firm up the next phase of FASTag growth, the road transport and highways ministry and the NHAI on Wednesday held a brainstorming workshop with top officials from the finance ministry and fintech firms. Road transport minister Nitin Gadkari said through collaboration with fintechs and other stakeholders, the govt aims at expanding the utility of FASTag into a robust platform that will 'enhance user convenience, streamline transport and mobility services'. Sources said road transport secretary V Umashankar said while FASTag has largely introduced manless tolling and eliminate barriers this can be used for other purposes linked to vehicles, such as paying for fuel, insurance premium and traffic challan, as the govt has enforced the 'one vehicle, one tag' rule. On the prospect of allowing insurance companies to issue FASTag to increase coverage of insured vehicles from 50% to 75%-90% in three years, the secretary said this is possible but there is a need to cleaning the 'Vahan' database, which has around 7.5 crore inactive vehicles.


Time of India
5 hours ago
- Time of India
NTPC says 3,300-MW project in Bihar will become commercially operational on July 1
State-owned power giant NTPC on Thursday said that its 3,300-MW Barh Super Thermal Power Project in Bihar will become commercially operational once the Unit-3 of 660 MW under Stage-I begins commercial supply on July 1. The four units of 660 MW under Stage-I and Stage-II of the project are already commissioned. Unit-1 and Unit-2 of 660 MW each of the project were commissioned in November 2021 and July 2023, respectively. Unit-4 and Unit-5 of 660 MW each under Stage-II were commissioned in November 2014 and February 2016, respectively. According to a regulatory filing, Unit-3 (660 MW) of Barh Super Thermal Power Project, Stage-I (3x660 MW) is to be declared commercially operational with effect from July 1, 2025. With this, the total installed and commercial capacity of NTPC on a standalone and on group basis will become 60,978 MW and 82,080 MW, respectively. The Barh project has total approved capacity of 3,300MW (660X5) with three units of 660 MW each in Stage-I and two units of 660 MW each in Stage-II.