
CM reviews crucial infra projects in ‘war room' meet
Mumbai: CM
Devendra Fadnavis
directed the use of modern technology to conduct an accurate survey of projects like Dharavi. He held a review on Monday of 15 new infrastructure projects, along with resolving 31 problems of 18 other projects that were discussed at a previous meeting where 71 problems were identified.
New projects from Mumbai, Vidarbha, Marathwada, and Western Maharashtra were reviewed, including Mumbai Metro Line 2B (DN Nagar to Mandala), Metro Line 4 (Wadala to Kasarwadavali), Metro Line 5 (Thane-Bhiwandi-Kalyan), Orange Gate to Marine Drive Tunnel Project, and Borivali to Thane Link Tunnel Project, among others.
Fadnavis directed land acquisition process be expedited and that forest and environmental permissions be obtained, besides preparing a zonal master plan for ecologically sensitive zones. He directed that decisions regarding forest land affecting the
Vadhavan Port project
be taken at the earliest. tnn
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
7 hours ago
- Indian Express
Mumbai Metro One turns 11 tomorrow, serving 111 crore passengers since 2014
Mumbai's first east-west Metro corridor, Mumbai Metro Line 1 or Metro One, completes 11 years of operation on Sunday, transporting over 111 crore passengers to date. Since its commencement on June 8, 2014, the 11.4-km Versova-Andheri-Ghatkopar (VAG) corridor has become a lifeline for suburban railway commuters, saving time for the east-west commute. This milestone highlights the increasing dependence on Mumbai's maiden Metro line, which now transports almost 5 lakh passengers daily. 'On its 11-year run, Mumbai Metro One has made more than 12.66 lakh train journeys, traversed more than 1.45 crore km and recorded a punctuality rate of 99.99%,' operator Mumbai Metro One Private Limited (MMOPL) said. Metro One was designed as a fast, modern and secure alternative to the clogged roads and suburban rail network of Mumbai and developed on India's first public-private-partnership (PPP) model, with Reliance Infrastructure and the Mumbai Metropolitan Region Development Authority collaboration. The service was inaugurated by the then chief minister Prithviraj Chavan and opened for public use the same day, attracting thousands of commuters in its early hours. 'Over the years, the Metro has evolved into more than just a transport link. It has become an integral part of Mumbai's daily commute, offering speed, safety, and seamless connectivity,' a Metro One spokesperson said. The line connects two of the city's busiest commercial hubs, Ghatkopar and Andheri and has played a key role in reducing travel time between Versova and Ghatkopar from 90 minutes to just 21 minutes. Besides, the foot traffic at key stations indicates that the line is preferred by commuters with Ghatkopar seeing almost 30 crore travellers, Andheri 23 crore and Saki Naka 11 crore, since its opening. The line is also recently lauded for reducing peak hour bottlenecks, introducing short loop operations between Andheri and Ghatkopar, and facilitating faster turnarounds without affecting full-length operations. Recent connectivity with other Metro lines – Line 2A at D N Nagar, Line 7 at Western Express Highway, and Line 3 at Marol Naka – has facilitated quicker east-west and north-south journeys. This multi-corridor connection has also eased pressure on suburban rail and road networks. 'Mumbai Metro One has been awarded more than 40 international and national awards for innovation, safety, and efficiency. It has also contributed to green mobility through fuel savings and reduction in city emissions. Entering its 12th year, Metro One continues to drive sustainable, intelligent mobility to Mumbai,' the spokesperson added.


Mint
14 hours ago
- Mint
Revathi Kamath, mother of Zerodha co-founders, takes Bengaluru Metro: Check her Instagram post
Revathi Kamath, the mother of Zerodha co-founders Nikhil and Nithin Kamath, praised Bengaluru Metro in an Instagram post. The environmentalist shared a photo in a pink saree, standing in the women's coach. 'Travelling in Metro is so much convenient and that too in female compartment!!!' she wrote. In her Instagram bio, she calls herself an 'environmentalist and Veena player'. There is no mention of her remarkably-accomplished sons. However, in an earlier interview, she praised her sons. 'I have brought them up to contribute. My sons, especially Nithin, tell me – 'You do it with your own money and don't depend on any organisations, only then people will recognise you.' Nikhil at times will transfer money for a project to me without asking anything,' she told Indian Express. Social media users reacted to her Bengaluru Metro post. One of them wrote, 'Looks like you really enjoyed your metro ride, Revathi.' 'Are u planning to buy Bangalore Metro,' quipped another. Revathi Kamath was born in Shringeri into a learned Brahmin family where music and education played a major role. Her father, N. Krishnamurthy, was a lawyer and skilled Veena player who later taught music full-time. Her creative journey began when her husband brought her flowers from work. Inspired, she explored floral decorations. Borrowing ₹ 5,000 from a friend, she showcased her talent at Wipro and landed a ₹ 45,000 project. Balancing home life and motherhood, she slowly built her name. She opened a small flower shop in Jayanagar, which grew quickly. She later started Calyx, an event company that handled weddings and big corporate events. When Bosch asked her to do landscaping, she self-studied the subject and bagged her first ₹ 4.5 lakh project. Soon, she became a top landscape expert and handled projects for prestigious companies like Tata Steel.


Time of India
a day ago
- Time of India
1.6k cr Godavari purification work to begin before Kumbh
Nashik: The Godavari purification project worth Rs1,600 crore to make the river free of pollution will start before the Simhastha Kumbh Mela to be held between 2026 and 2028. Nashik Municipal Corporation (NMC) has completed the tender process and finalised an eligible private agency. During the Kumbh Mela meeting held in Nashik city last week, NMC commissioner Manisha Khatri requested Fadnavis for his approval to award the contract to the agency concerned. Speaking to reporters after the meeting, the CM said he had received the proposal and it was under consideration. Khatri told TOI the state govt is positive about the agency and NMC expects to get an approval soon. The Godavari purification project includes construction of four large new sewage treatment plants (STPs) in place of the eight old ones, construction of sewage pumping stations and diverting untreated sewage from 22 nullahs to STPs through new sewage lines to be constructed under the project. NMC's nine old STPs are around 30 years old. The civic body's major concern is that levels of biological oxygen demand and the total suspended solids of the treated sewage water at the old STPs are in the range of 20 to 25. It needs to be below 5 as per environmental norms. The total sewage water treatment capacity of these old nine STPs is around 342 MLD. At present, the civic body has 11 STPs, including nine old ones, treating sewage water with a total treatment capacity of 392 MLD. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Sanitize & Smooth Clothes Fast with Philips Steamer Philips Garment Steamers Shop Now Undo Two new STPs were built and made operational over the last two years. One with a capacity of 18 MLD was built in Gangapur and the other with a capacity of 32 MLD at Pimpalgaon Khamb. NMC decided to construct four new STPs and upgrade an existing one with a total capacity of new STPs instead. The four new STPs will come up at Tapovan (180 MLD capacity), Agartakli (97 MLD), Chehedi (64 MLD) and Panchak (75 MLD). Existing old STP at Agartakli with a capacity of 70 MLD is to be upgraded with new technology, said officials. Untreated domestic sewage is released in 22 nullahs flowing into the Godavari river and causing pollution. With the new STPS, untreated waste will be diverted to the nearby facilities by laying new sewage lines. As many as 10 sewage pumping stations will be built. Get the latest lifestyle updates on Times of India, along with Eid wishes , messages , and quotes !